The institute in the process of signing framework contracts with suppliers for assorted items for a period of 12 months (renewable).
Please download the bid documents in the link below for more details
eikra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/uhtti/test.uhtti.ac.ug/wp-includes/functions.php on line 6131
The institute in the process of signing framework contracts with suppliers for assorted items for a period of 12 months (renewable).
Please download the bid documents in the link below for more details